Keeping a rollback artefact is not the same as being able to roll back: missing dependencies, unsynced configuration or unreadable backups usually surface only during a real incident. Treat rollback as an operation to rehearse, run it periodically in an isolated environment, and record the time and blockers for each step.

Write down the expected recovery time and prerequisites rather than a bare backup-exists note. If actual recovery takes far longer, fix dependencies and scripts first and only then discuss release cadence; a failed rehearsal should keep the change out of the normal window.

This article makes no deployment decision and draws no conclusion from a single rehearsal; it only asks that the ability to roll back be backed by evidence rather than a promise.